First stator installed in turbine pit of power station at right bank of Three Gorges
News Archive - Coal & Electric Power -September news )
(Sp.com, Sept 27, 2006) The No. 26 stator was successfully installed in the turbine pit of the power station located at the right bank of the Three Gorges on Sept. 23, 2006. The installation project is carried out by China Gezhouba (Group) Corporation.
source:Sp.com
tag:
Drawn from Chinese language press